Supplied overhauled and ready for installation
Capacity approx. 150ltr.
Outer jacket steel boiler plate
Steam jacket with insulation stainless steel
Heating: Electricity
Equipment: 4 x heating elements of which 3x 9 KW, 1x 7.5 KW
3 Bubble plates in column
Side entry doorway.
Tubular cooler including cooling water regulator
Water level limiter in water bath
Control for switching all circuits
Main switch, agitator, heating elements
Lead time for carrying out the gas & oil modifications in the factory – 8 weeks
Price: On request Euros, GBP or USD ex works as is excluding dismantling, packing and loading.
The information provided is for guidance only and the buyer should check all details upon inspecting the line